Here Are the Final Details Between Colombia and the US Over Deportation Flights
If It Wasn't on HBO, ESPN's Stephen A. Smith Wouldn't Be Invited Back...
The Manic Buckshot Presidency
WH Hails Capturing Top Illegal Immigrant Criminals and It's Monumental
How RFK Jr. Plans to Tackle the Opioid Crisis
Trump Releases Weapons Biden Withheld From Israel
NYC Sees First Five-Day Period in 30 Years With No Shooting Victims
Federal Worker Slams Trump’s Executive Order: 'It’s Making My Job Harder'
How JD Vance Was the Man Behind the J6 Pardons
JD Vance's First Interview as VP Is Brilliant
UPDATE: Colombia President Backs Down After Trump Threatens Nation for Rejecting Deportati...
Under Trump’s 'One Flag Policy,' Only Old Glory Takes the Spotlight
Trump Brings Back Mexico City Policy
Bishop Who Rebuked Trump During National Prayer Launches Liberal Media Blitz
Trump Keeps Major Campaign Trail Promise
Tipsheet

In the Age of AI, One City Still Relies on Obsolete Technology to Operate Part of Its Train System

The San Francisco Municipal Transportation Agency is concerned the technology it’s using may break down soon—and the solution will not be as easy as downloading a quick update. That’s because since 1998, SFMTA has been operating the city’s light rail system with floppy disks, which came as a shock to passengers. 

Advertisement

"Wow. I mean I thought we were moving on to AI. So why are we doing floppy disk," wondered SFMTA passenger Katie Guillen, reports ABC7News.  

Mariana Maguire of the SFMTA Train Control Project explained why they’re still in use.  

"We were the first agency in the U.S. to adopt this particular technology, but it was from an era that computers didn't have a hard drive, so you have to load the software from floppy disks on to the computer," she said, according to the report.

"The floppy disk is one component of one system,” she added. “The system that automatically controls our trains inside the subway. But our metro system that operates citywide has many components to it."

The system was designed to last for a quarter of a century, but concerns are being raised now that it’s continuing to be used past its best-by date.

"The system is currently working just fine, but we know that with each increasing year, the risk of data degradation on the floppy disks increases and that at some point there will be a catastrophic failure," SFMTA Director Jeffrey Tumlin said. 

Advertisement

Upgrading the system will be a real challenge, financially and otherwise.

"The detail project schedule will be finalized once we have a contractor onboard. This is effectively a multi-phase decade long project that starts with pieces of market street subway and pieces in the surface. Ultimately our goal is to have a single train control system for the entire rail system," said Tumlin.

They’re hoping the bulk of the cost, estimated to be in the hundreds of millions, will be covered by state and federal grants. 

"The rest of it will come from Muni's rapidly declining internal capital resources," Tumlin said.

Join the conversation as a VIP Member

Recommended

Trending on Townhall Videos

Advertisement
Advertisement
Advertisement